Retrofitting high rises with Air source heat pumps

Retrofitting Premier Court Apartments at 41 Speers Road with Panasonic ductless air conditioners

technical and aesthetic challenges of retrofitting
Design review

Building Info

  • 18 floors
  • 135 suites
  • 1, 2, and 3 bedrooms
  • Built in the 1970s

Further details about the building

Retrofitting and Construction

  • Start date: July, 2021
  • Competition: November, 2021

The building was built in the 1970s and recently went through a complete renovation of the bachelor, one and two bedroom apartments. Retrofitting was completed to ensure the comfort of the residents and to save costs on equipment and utilities.

During the successful HVAC retrofit project, the apartments have been equipped with Panasonic ductless mini-split heat pumps, providing an energy-efficient heating and cooling system that was easy to install and use, and would allow for independent temperature control in each apartment as well as savings on future energy bills.